About Shanghai centrifuge the other information please visit http://www.shlxj.com.cn/ for more details.
A, device
A centrifuge. Shanghai in the pre cooling state, centrifuge lid must be closed down, centrifugal taking out the turn upside down on the bench, dry cavity residual water, centrifuge lid is open.
Two. Head turned in pre cooling cover can be placed in the centrifuge on the platform, or placed in the experimental stage, never do not tighten the floating in the head, because once the false start, head cover will fly out, causing the accident!
Three. Head cover in tightening must finger touch head and rotating cover between any gaps, such as a slot to unscrew the re tighten, to ensure no gap can only start centrifuge.
Four. During centrifugation, the operating personnel shall not leave the centrifuge chamber, once the abnormal condition of the operator can not shut off power (POWER), according to STOP. In the pre cooling before fill in the centrifuge use record.
Five. Do not use fake centrifugal to make the tube, shall not use the centrifugal aging, deformation, crack pipe.
Six. During the holidays and night last using centrifuge routine security checks can go ahead.
Seven. Episodes in the use of instruments in the process of mechanical failure, component damage situation should be promptly contact with manufacturers